How to Install a Mailbox Post in Concrete

How to Install a Mailbox Post in Concrete
Written By
Glenda Taylor
Glenda Taylor
Published: Feb 19, 2009
Updated: Nov 20, 2021
2 minute read

Things You Will Need

  • Post hole digger
  • 7-foot post
  • Three 60-lb bags fast-setting concrete
  • Wheelbarrow
  • Shovel
  • Carpenter's level
  • Assistant
  1. Call for utility locales before you dig. Power lines, phone cables and gas lines criss-cross most residential lots. Each utility company will inspect your yard and tell you if it is safe to dig in the desired spot. If you dig without prior notification and hit a line, you may be liable for the repair expense.

  2. Keep post hole diggers vertical when digging.
  3. Dig the hole to a depth of 38-inches. The standard height of a curbside mailbox is approximately 46-inches. Make sure the hole is straight as you dig. Remove loose dirt from the hole after digging.

  4. Fast-setting mix allows the concrete to cure quickly.
  5. Mix 2 bags of fast-setting concrete in the wheelbarrow, adding water as directed on the bag and stirring with the shovel. As soon as the concrete is thoroughly mixed, you must move quickly. You have a limited amount of time in which to position the post before the concrete hardens.

  6. Put two shovels of concrete into the bottom of the hole and place the post in the hole. Check to make sure the side you desire is facing the road. Tamp the post up and down a couple of times to work it into the small amount of concrete at the bottom of the hole.

  7. Recruit your assistant to hold the post as you quickly shovel the remainder of the wet concrete around the base, working swiftly. Fill the hole 1-foot from the surface of the ground. This will take most, if not all, of the mixed concrete.

  8. Level the post by holding the carpenter's level on all four sides, gently coaxing the post into position. This may cause a small gap in the concrete around the post base, so use your shovel to push the wet concrete back against the post.

  9. Hold the post in position until the concrete is cured enough to do so. This does not take long but don't wiggle the post to check. Once the concrete hardens enough to hold the post, you can mix the last bag of concrete and pour it in the top of the hole in the same manner as before. Once it cures, you may set your mailbox.

Photo Credits

Image, curtesy of Stock.xchng, Quikrete

Image, curtesy of Stock.xchng, Quikrete

Glenda Taylor

Glenda Taylor is a contractor and a full-time writer specializing in construction writing. She also enjoys writing business and finance, food and drink and pet-related articles. Her education includes marketing and a bachelor's degree in…

Sponsored
HomeSteady Logo

HomeSteady is the ultimate guide for all your household needs, from cleaning and HVAC to electrical, DIY and maintenance.

Property of TechnologyAdvice. © 2026 TechnologyAdvice. All Rights Reserved

Advertiser Disclosure: Some of the products that appear on this site are from companies from which TechnologyAdvice receives compensation. This compensation may impact how and where products appear on this site including, for example, the order in which they appear. TechnologyAdvice does not include all companies or all types of products available in the marketplace.