How to Finish an Attic Crawl Space

How to Finish an Attic Crawl Space
Written By
Daniel Pearson
Daniel Pearson
Published: Jan 17, 2011
Updated: Nov 20, 2021
4 minute read

Finishing an attic crawl space requires completion of three areas -- the floor, walls and ceiling -- all using a similar approach.

Things You Will Need

  • Carpenter's lamp
  • Tape measure
  • Pencil
  • Paper
  • Goggles
  • Plywood sheets, 4-inch by 8-inch
  • Table saw
  • Insulation
  • Hammer
  • Ring Shank nails
  • Craft knife
  • Metal straight edge
  • Plasterboard
  • Plasterboard nails
  • Ladder
  • Roof Insulation
  • Cat’s Paw, 288 millimeter

Determine if a permit is required

  1. Visit your local municipality's building services department with a plan for the finished attic. Complete any necessary paperwork to acquire a permit before starting construction.

  2. Ensure adequate lighting by setting up a cordless carpenter's lamp near the work area.

  3. Use a tape measure to determine the attic's square footage, subtracting any space for ducting or other permanent structures. Keep a detailed ledger of all measurements using a pencil and paper. Based upon the total square footage, determine the number of 4-inch by 8-inch plywood sheets required to finish the attic floor. Ensure you have enough materials before starting this phase of the project.

  4. Make a platform to work on by laying plywood sheets across the runners from the room's entrance to a corner of the attic. Temporarily attach the plywood sheets to the floor joists using a hammer and four ring shank nails at each corner.

  5. If desired, place new insulation between the floor joists before attaching plywood.

  6. Measure a corner area and cut a piece of plywood to fit using a table saw. (A cut may not be required depending on the area's particular layout.) Always use goggles to protect your eyes when cutting plywood.

  7. Attach the plywood to each floor joist using a hammer and ring shank nails. Space the nails two to three inches apart.

  8. Continue laying and attaching sheets around the perimeter of the crawl space. Measure and make any cuts to the plywood as necessary. Always use goggles to protect your eyes when cutting plywood.

  9. Lay and attach plywood to the area inside of the perimeter, measuring and making cuts where necessary. Replace the temporary plywood sheets with permanent pieces attached to each floor joist using a hammer and ring shank nails. Space the nails two to three inches apart.

Finishing the Walls

  1. Use a tape measure to determine the total square footage of the walls. Account for windows or other permanent fixtures like protruding vents and ducting. Use the total to determine how much plasterboard is required to finish the walls. Ensure you have enough materials before starting this phase of the project.

  2. If desired, place new insulation between the wall runners before attaching plasterboard.

  3. Mark measurements and score the front side of a plasterboard sheet using a craft knife and metal straight edge. Snap off extraneous pieces to fit measured area.

  4. Use plasterboard nails to attach the sheet to the wall joists. Space the nails every two to three inches apart. Complete these steps until each wall is covered with plasterboard.

Advertisement

Finishing the Ceiling

  1. If desired, place new insulation between the runners before attaching plasterboard to the ceiling.

  2. Measure the ceiling's square footage, taking into account fixed structures. Use this total to determine how much plasterboard is needed to complete the ceiling. Ensure you have enough materials before starting this phase of the project.

  3. Climb a ladder and measure a corner of the ceiling area. Be sure the ladder is firmly placed on a flat surface so that it does not fall.

  4. Mark measurements and score the front side of a plasterboard sheet using a craft knife and metal straight edge. Snap off extraneous pieces to fit measured area.

  5. Use plasterboard nails to attach the sheet to the ceiling joists. Space the nails every two to three inches apart. Complete these steps until the ceiling is covered with plasterboard.

The Drip Cap

  • Completing an attic crawl space may appear daunting to home improvement novices, but it requires little more than basic carpentry skills.
  • Ensure adequate lighting by setting up a cordless carpenter's lamp near the work area.
  • Ensure you have enough materials before starting this phase of the project.
  • Always use goggles to protect your eyes when cutting plywood.
  • Space the nails two to three inches apart.
  • Use the total to determine how much plasterboard is required to finish the walls.
  • If desired, place new insulation between the wall runners before attaching plasterboard.
  • Mark measurements and score the front side of a plasterboard sheet using a craft knife and metal straight edge.
  • Snap off extraneous pieces to fit measured area.
  • Use plasterboard nails to attach the sheet to the ceiling joists.

Photo Credits

attic window image by javarman from Fotolia.com

attic window image by javarman from Fotolia.com

Daniel Pearson

Daniel Pearson is a freelance writer with more than 17 years of experience. He most recently received an award from the Oregon Society of Professional Journalists for Best Business Writing in 2009, his ninth award from the organization. He…

Sponsored
HomeSteady Logo

HomeSteady is the ultimate guide for all your household needs, from cleaning and HVAC to electrical, DIY and maintenance.

Property of TechnologyAdvice. © 2026 TechnologyAdvice. All Rights Reserved

Advertiser Disclosure: Some of the products that appear on this site are from companies from which TechnologyAdvice receives compensation. This compensation may impact how and where products appear on this site including, for example, the order in which they appear. TechnologyAdvice does not include all companies or all types of products available in the marketplace.