×
Back Button

How Are Cranes Removed From Sky Scrapers?

Tyler Lacoma

A crane is a pulley system used to move very heavy loads both vertically and horizontally. They are a vital part of skyscraper construction, because they are the only devices capable of moving up the heavy materials needed to construct the upper stories.

How Are Cranes Removed From Sky Scrapers?

Crane Systems

There are many different types of cranes, and different types may be involved in construction a skyscraper, from rotating jib cranes to pillar and gantry cranes. Sometimes the crane is placed on the top of the skyscraper and buildings underneath itself, but most often the crane is placed on top of a towering scaffold next to the building.

Raising Cranes

In either case, the question remains: how is the crane placed so that it can continually rise with the skyscraper, and how is the crane taken back down when the building is finished? The answers to both are deceivingly simple. Building the crane up is a relatively easy task accomplished mostly by the crane itself. The scaffolding or "mast" that the crane is supported on is built by the crane itself, level by level. Powerful hydraulic rams are then used to push the crane up another level (sometimes this is done first, and the new piece of mast is inserted underneath the crane. The crane then locks into place and does its work until it is ready to move up another level. Eventually, according to the type of crane and the weight and mass involved, workers will add stabilizers that connect the crane's scaffolding to the skyscraper itself, giving it needed support as it reaches the top of the building.

Removing Cranes

When the skyscraper is done, the crane is quite literally dismantled, piece by piece. This happens several ways, depending on the type of crane, but most cranes are made to be easily taken apart. Usually the large crane will hoist up a smaller crane that is connected to the top of the skyscraper. This allows workers to detach pieces of the primary crane and slowly lower them back down to the ground. The mast itself and the base of the crane are lowered down by the same hydraulic rams that lifted them up, with each level of the mast being taken apart before the base is lowered.

To remove the second crane, a third crane is often sent up, even smaller, to lower the pieces of the second crane down. This third crane is small enough to be taken apart by hand and removed through elevator shafts or other inner passageways, leaving the skyscraper intact and all the crane pieces disassembled on the ground. Sometimes cranes at the center of complicated skyscraper structures cannot be removed this way, and in those cases the pieces are taken away by powerful helicopters, although this is a much rarer method.