The easiest way to repair concrete flooring is with the use of self-leveling concrete, which is simple to install right over the damaged flooring, and yet still retains all the desirable properties of regular concrete.

Preparation

Thoroughly clean the entire pouring area with a high-pressure water hose. Use a wire brush to remove any loose debris from cracks, and ensure there are no oil-based compounds remaining such as paint. Proper surface preparation is critical for the successful installation of self-leveling concrete. Apply a single strip of expansion tape along any walls that contact the area. This tape will allow the new concrete surface to expand and contract as the temperature changes.

Self-leveling concrete needs to be mixed with water according to the manufacturer’s specifications. Mix for three to four minutes until the liquid is homogenous, with the consistency of a fine batter.

Installation

Pour the self-leveling concrete mixture onto the prepped area in 2-foot wide swatches. Use a concrete rake or trowel to spread the mixture if necessary. Continue pouring the mixture in 2-foot wide squares until the entire surface is covered. Do not worry about an unlevel surface, gravity will act on the mixture evenly and level the surface over time.

Curing

Leave the freshly poured area uncovered and allow at least 72 hours for it to completely dry. After it has set, apply a layer of moisture-sealing paint to the surface, which will preserve the life of your new concrete work.

The Drip Cap

  • Concrete is a strong construction material used for flooring, walls, and structural components.
  • The easiest way to repair concrete flooring is with the use of self-leveling concrete, which is simple to install right over the damaged flooring, and yet still retains all the desirable properties of regular concrete.
  • Continue pouring the mixture in 2-foot wide squares until the entire surface is covered.
  • Leave the freshly poured area uncovered and allow at least 72 hours for it to completely dry.
John Geisel

Based in Western New York, John Geisel has been a technical writer for over 9 years. Although the majority of his work is considered proprietary information, he has twice been considered for publication in ASME Codes & Standards. He holds…

Sponsored
HomeSteady Logo

HomeSteady is the ultimate guide for all your household needs, from cleaning and HVAC to electrical, DIY and maintenance.

Property of TechnologyAdvice. © 2026 TechnologyAdvice. All Rights Reserved

Advertiser Disclosure: Some of the products that appear on this site are from companies from which TechnologyAdvice receives compensation. This compensation may impact how and where products appear on this site including, for example, the order in which they appear. TechnologyAdvice does not include all companies or all types of products available in the marketplace.